On-site validation and implementation of new Hy-logging technologies
Project Overview
Project Number
M0400
Total Grant Value
$390,000
Program Area
MRIWA Contribution
$-
Project Theme
Detection Technology
Project Period
2004 - 2010
Report title: On-site validation and implementation of new Hy-logging technologies – Technology transfer and re-skilling
Summary
This project had the objectives of validating existing Hylogging results and collaborating with mine site staff to equip them with skills in Hylogging mineralogical interpretations and interpreting chemical architectures implied by their deposit samples.
Results included validation mineralogically and spatially of the significance of interpreted hydrothermal assemblages and developing 3D models at three gold deposits, as well as assisting knowledge transfer.
Keywords: 3D deposit architecture, hylogging, hydrothermal assemblages, silicate alteration mineralogy, gold mineralization
Similar Projects
Page was last reviewed 20 June 2022