Search this website

Project Overview

Project Number
M0037
Project Theme
Mining Technology

Summary

The development of a micro-processor-based load monitoring equipment for wire rope shovels began in 1984, and a prototype system was built, installed and commissioned, after which a pre-production system was installed at a second mine site.

Keywords: mining, wire rope shovels, load monitoring

Page was last reviewed 9 May 2022

Back to main content